header info

To see what jewelry creations are currently available Click here!

Thursday, January 29, 2015

Fixed the Kiln and Started Creating Stations in my Workshop

Setting up "stations" in the workshop.  I find this very exciting.  No more "setting things up" if I want to solder or enamel or polish.  Will takes photos when the room is done.

Went to fire a batch of metal clay pieces this morning and noticed the kiln wasn't heating up.  Called JenKen and they suggested I replace the relay.  Was REALLY happy the suggested I buy a spare relay the first time I broke my coil and ordered a replacement.  So that relay's been sitting in my storage unit for over two years.

After opening the control box, I took a photo.  I'm very meticulous about putting things back together the way they were and since that black thing (where the red arrow is pointing) beneath all the wires was what I had to replace, I knew I'd never remember where all the wires went back.

I grabbed the masking tape and as I removed each screw, I taped the screw to the wires because three of them had multiple wires and I needed to make sure I put the right pairs back together.  I also wrote a number on the masking taped wires that corresponded to a diagram I'd drawn of the screw holes to make sure I put the right wires back where they were.

Going to storage to get my relay, running to the hardware store to get a 1/4 inch nut driver, and then actually replacing the relay took less then two hours.

I was so happy to see the kiln start up.

Here's what's in it (next blog post I can show you how they came out).  Still working on that riveted cuff.

I want to try some inlay (enamel, resin, whatever) so I made those two recessed framed pieces.  The teardrops I am testing out if I like them drilled vertically or horizontally.  The triangle is a garbage piece I think... just testing a pattern.

I consider this a happy day.  I repaired my kiln.  Yay!


No comments:

Post a Comment